Call 915-915-1041 Request a Quote
Division 9 Interior Finishes

From framing
to final coat

Metal stud framing, gypsum board, acoustical ceilings, painting, and related interior finish scopes — one crew chain from layout to turnover.

The scopes

Division 9, under one subcontract

Metal stud framing

Interior partitions and framing layouts installed straight, plumb, and ready for board.

Gypsum board

Hanging and finishing that sets up clean paint-ready surfaces.

Acoustical ceilings

Ceiling grid and tile installed level and coordinated with MEP trades.

Painting

Interior painting and related finish scopes carried through to turnover.

Interior metal stud framing with window openings, ready for gypsum board
Why it works

Fewer subs. Fewer gaps.

When one subcontractor frames the walls, hangs the board, sets the ceilings, and paints, coordination problems disappear between trades that would otherwise point at each other. That’s why tenant improvement and interior build-out work is a natural fit for BorderTech — our recent past performance includes multiple TI and interior finish scopes across El Paso’s industrial market.

See past performance →

Tell us what you’re building.

Request a Quote